North West
Oldham's brownfield register covers five years of its target
Oldham's brownfield register holds more than 5 years' need, 106% of it, on the council's own capacity estimates. It built 115% of the homes the Housing Delivery Test required.
Oldham has to plan for 972 new homes a year, 4,860 over 5 years. Its brownfield register holds land for about 5,138 of them.
Homes to spare
276
homes over 5 years
Housing Delivery Test
115%
of required homes built, 2025 measurement
Oldham is one of the councils in North West with no land gap on this measure; 15 councils there have registers that can be totalled.
How the housing target is worked out
The government's standard method starts from the homes Oldham already has: 99,750, of which 0.8% is 798 a year. Homes there cost 6.15 times local workplace earnings, on the five-year average. Every 1% that ratio sits above 5 adds 0.95% to the baseline, an uplift of 21.9%, which gives 972 homes a year.
Delivery
Over the three years to March 2025, Oldham delivered 1,395 homes against the 1,212 it was required to: 115%. No consequence applies.
What is on the brownfield register
130 live sites covering 97 hectares, of which 79 have no planning permission yet. 26 give no housing estimate, so the capacity above is a floor, not a total.
Nearby councils
3 of the 5 nearby councils with a cover figure have less brownfield cover than Oldham.
| Council | Homes a year | Brownfield covers | Still to find |
|---|---|---|---|
| Tameside | 1,156 | 61% | 2,278 |
| Rochdale | 970 | 113% | none |
| Manchester | 2,601 | register incomplete | — |
| Bury | 999 | 59% | 2,045 |
| Salford | 1,396 | 612% | none |
| Stockport | 1,901 | 42% | 5,488 |
Councils with similar brownfield cover
- Oxford: 106% cover
- Lichfield: 107% cover
- Hartlepool: 104% cover
- Coventry: 103% cover
- Worcester: 109% cover
- Welwyn Hatfield: 110% cover
A council short of land has to find more, and the 17 August 2026 planning framework widened what counts as grey belt. This page describes the council's position. It does not say whether any particular piece of land would get permission.
Housing Delivery Test 2025 measurement, published 17 August 2026.