Skip to content
Land·Gap

How much land each council still has to find for new homes

North West

Tameside must find land for 2,278 more homes

Tameside's brownfield register covers 61% of 5 years' need, so most of its new homes will have to come from land that is not on the register. It built 232% of the homes the Housing Delivery Test required.

Tameside has to plan for 1,156 new homes a year, 5,780 over 5 years. Its brownfield register holds land for about 3,502 of them.

Brownfield with permission: 501 Other brownfield on the register: 3,001 Still to find: 2,278

Brownfield cover

61%

of 5 years' need, calculated. How

Still to find

2,278

homes over 5 years

Housing Delivery Test

232%

of required homes built, 2025 measurement

That is the 3rd largest land gap of the 15 councils in North West whose registers can be totalled.

How the housing target is worked out

The government's standard method starts from the homes Tameside already has: 106,023, of which 0.8% is 848 a year. Homes there cost 6.91 times local workplace earnings, on the five-year average. Every 1% that ratio sits above 5 adds 0.95% to the baseline, an uplift of 36.3%, which gives 1,156 homes a year.

Delivery

Over the three years to March 2025, Tameside delivered 1,643 homes against the 708 it was required to: 232%. No consequence applies.

What is on the brownfield register

96 live sites covering 41 hectares, of which 72 have no planning permission yet.

Nearby councils

2 of the 5 nearby councils with a cover figure have less brownfield cover than Tameside.

CouncilHomes a yearBrownfield coversStill to find
Oldham972 106% none
Manchester2,601 register incomplete —
Stockport1,901 42% 5,488
Rochdale970 113% none
Salford1,396 612% none
High Peak580 43% 1,655

Councils with similar brownfield cover

A council short of land has to find more, and the 17 August 2026 planning framework widened what counts as grey belt. This page describes the council's position. It does not say whether any particular piece of land would get permission.

Housing Delivery Test 2025 measurement, published 17 August 2026.